Supply of a milling centre
Staedler Automation AG was allowed to implement a robotics solution for supplying a milling centre.
Aluminium profiles are fed in in four positions in frames intended for this. The robot will place them in the milling centre for processing. Then they will be punched as required and put down in the frame again.
Automation achieves an autonomy time of 28 h.
Work performed at Staedler Automation AG
- Handling design
- Construction
- Hardware engineering
- Software engineering robotics
- Assembly
- Commissioning
- Service and support